-CSBP Limited-2000 Tonne Nitric Acid Tank Fabrication Management and Installation-2IPS provided the fabrication management services for the delivery of a 2000 tonne nitric acid tank at the CSBP AN2 Project Kwinana location.  
IPS provided the full suite of services from tendering to final delivery of the MDR documentation. To ensure appropriate control of the fabrication, IPS maintained a full time fabrication management representative to interface with the supplier.  This included managing design, shop manning levels, job supervision, schedule/cost control and reporting, QA/QE and the MDR compilation and finalisation.

The scope of the project comprised:

Project Facts
Location Kwinana, WA
Client CSBP Limited
IPS Role Fabrication Management