+61 8 9286 5777

ips@ips-projects.com.au

Contact Us






Image 2IPS' experience in rapid off-site fabrication management led to our engagement by Calibre Projects to manage the delivery of a 336 Tonne load-out bin from a fabrication facility in China. The project involved the management of two workshops involved in cutting and welding of heavy plate to construct the bin and the heavy structural steel section sizes. The complex work scope involved maximizing the off-site fabrication and pre-fitting work in order to minimize the onsite construction man-hours.

The delivery was managed by the 14 person IPS team located in China and we successfully completed the delivery in a time frame of approximately 2 months.

Project Facts
Location Sanxin & Tianjin, China
Client Calibre Projects
IPS Role

Client Representative Fabrication and Quality Management

The project scope included:

  • Project Fabrication Management
  • Fabrication Material Tracking System (AssemblyBASE)
  • Planning & Scheduling
  • Reporting and Cost Control
  • Logistics Material Tracking
  • Quality Control & Assurance Management
  • Management of Third Party Inspectors