DSCN3674 CSBP 640x480IPS senior personnel have decades of experience in chemical and petro-chemical plant project, design, construction and fabrication management.

IPS has been involved in the CSBP Ammonium Nitrate expansion project at Kwinana W.A. and the Dyno Nobel Asia Pacific Ammonium Nitrate Emulsion (Hadrian) at Port hedland W.A. project.

 The involvement included:-

  • feasibility studies,
  • process technology licence negotiations (AN prill and nitric acid plant),
  • project management,
  • design management (basic and detailed engineering),
  • construction management,
  • fabrication management (world-wide),
  • cost control and reporting,
  • tender preparation,
  • procurement, expediting and inspections,
  • planning and scheduling,
  • commissioning,
  • performance acceptance testing and
  • operational readiness and handover.


     

Project Spotlight

6010-CSBP Limited-East West Pipe Rack-3The steelwork for the East-West piperack was fabricated in China.

...